ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
(2) If removed, install offset over LOP engine shutdown cable.
CAUTION
If installing new LOP engine shutdown cable, ensure inner
cable is cut to a length of 16.54 in. (420.1 mm). If cable is too
long it may not trip stop lever when LOP solenoid actuates.
make the LOP shutdown cable.
(3) If removed, install cable guide on LOP engine shutdown cable.
(4) If removed, install LOP solenoid plunger on LOP engine shutdown cable with
screws. Ensure cable is bottomed out in plunger before tightening screws.
(5) Insert LOP engine shutdown cable through grommet ensuring that LOP solenoid
plunger enters cylinder of LOP solenoid.
(6) Seat cable guide in grommet.
(7) Close and secure instrument panel.
(8) Connect LOP engine shutdown cable to red STOP lever and governor regulator
bracket. Pinch ears on red STOP lever to capture LOP engine shutdown cable.
(9) Install cable ties as necessary to secure LOP engine shutdown cable to engine
harness.