TM 9-6150-228-13&P
5-10
ELECTRICAL LEADS.
This task covers:
a. Removal
b. Repair
c. Installation
INITIAL SETUP
Tools
Equipment Conditions
General Mechanics Automotive Took Kit
Reference
(Item 2, Appendix B).
Para 2.5 Equipment shut down.
Portable Electric Drill (Item 4, Appendix B.
Riveter, Blind Head (Item 5, Appendix B).
Materials/Parts
General Safety Instructions
Paint (Item 4, Appendix E).
Lock Washers (Item 3, Appendix F).
WARNING
Gasket Strip (Item 26, Appendix F).
Latches (Item 8, Appendix F).
High voltage is present in this equipment during
Rivets (Item 7, Appendix F).
operation. Do not attempt making any repairs
without first shutting down all input power from the
Personnel Required.
power distribution panel. Failure to observe this
warning could result in serious injury or death.
One
REMOVAL
Refer to Chapters 4 and 5 and remove all components of the power distribution panel.
REPAIR
Repair is limited to replacing defective parts, pounding out dents, welding, sanding, and painting. Refer to TM 43-0139
for painting instructions.
a.
Disassembly.
(1) Remove eight nuts (1, Figure 5-11), flat washers (3), lockwashers (2), and four U-bolts (4). Discard
lockwashers (2).
(2) Remove nuts (5) from U-bolts (4).
(3) Remove nut (6) lock washers (7), terminal (8), screw (9), lock washer (10), and ground lug (11).
(4) Drill out four rivets (12) and remove two latches (13).
(5) Remove four nuts (14), screws (15), and nameplate (16).
5-22
