TM 9-6150-228-13&P
5-10
ELECTRICAL LEADS.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Conditions
General Mechanic's Automotive Tool Kit
Reference
(Item 2, Appendix B).
Para 2.5 Equipment shut down.
Torque Wrench (Item 6, Appendix B).
Para 4.15 Sub panel removed.
Materials/Parts
General Safety Instructions
Tags (Item 14, Appendix E).
WARNING
Personnel Required
High voltage is present in this equipment during
operation. Do not attempt making any repairs
One.
without first shutting down all input power from the
power distribution panel. Failure to observe this
warning could result in serious injury or death.
REMOVAL
a. Tag and identify leads at both ends.
b. Loosen three screws (1) and remove leads (2) from 400-amp circuit breaker (3).
c. Loosen three screws (4) on terminal block (5) and remove leads (2).
d. Loosen screw (6) on terminal block (7) and remove ground wire (8).
5-18