ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
(3) Remove nut (Figure 4-22), lockwasher, washer, and screw securing clamp and
ground strap to instrument panel.
(4) If necessary, remove clamp from electrical harness and ground strap from lug
terminal board mounting screw.
(5) Remove gauge protective cover. Then tag and disconnect electrical leads from
HERTZ frequency meter (MEP-531 only), VOLTS meter, %LOAD meter, HOURS
meter, VOLTAGE ADJ. potentiometer, GFCI receptacle (MEP-531 only), and INST.
(6) Remove rivets and instrument panel from control panel.
(7) If necessary, remove fastener from instrument panel and blind nut from control
panel.
(8) If necessary, remove edge protector and adhesive residue from control panel.
GROUND
STRAP
HINGE
NUT
LOCKWASHER
WASHER
BLIND
NS
TIO
UC
TR
INS
NG
NUT
ATI
ER
OP
SCREW
CLAMP
ION
UT
CA AC
V
120
SPA
RE
INSTRUMENT
1A,
INS
T.
EDGE
VO
LTA
G
-
EA
PANEL
DJ.
+
PROTECTOR
INSTRUCTION
CONTROL
PLATE
PANEL
FASTENER
RIVET