ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
(6) Install gauge protective cover.
(7) Close and secure instrument panel.
c.
Removal.
(2) Release instrument panel by turning fastener, open instrument panel slowly.
(3) Remove gauge protective cover. Then tag and disconnect HERTZ frequency
(4) Release instrument cover by turning fastener, open instrument cover.
(5) Remove screws.
(6) Remove HERTZ frequency meter from instrument panel.
d.
Installation.
(1) Insert HERTZ frequency meter (Figure 4-23) into instrument panel.
(2) Apply locking compound (Item 6, Appendix E) to screws.
(3) Install screws.
(4) Connect electrical leads and remove tags. Then install gauge protective cover.
(5) Close and secure instrument panel and instrument cover.
VOLTS METER.
a.
Inspection.
(2) Release instrument cover by turning fastener, open instrument cover.
(3) Release instrument panel by turning fastener, open instrument panel slowly.
(4) Inspect VOLTS meter for security, cracked lens, corrosion, and other damage.
(5) Close and secure instrument panel and instrument cover.
b.
Testing. (VOLTS AC Meter)
(1) Release instrument panel by turning fastener, open instrument panel slowly.
(2) Remove gauge protective cover.