ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
S
ON
CTI
TRU
INS
NG
ATI
ER
OP
1A,
INS
T.
FUS
VO
E
LTA
G
-
SCREW
ON
UTI
CA C
VA
120
VOLTS
METER
(5) Remove screws.
(6) Remove VOLTS meter from instrument panel.
e.
Installation.
(2) Apply locking compound (Item 6, Appendix E) to screws.
(3) Install screws.
(4) Connect electrical leads and remove tags. Then install gauge protective cover.
(5) Close and secure instrument panel and instrument cover.
4.26.
%LOAD METER.
a.
Inspection.
(2) Release instrument cover by turning fastener, open instrument cover.
(3) Release instrument panel by turning fastener, open instrument panel slowly.
(4) Inspect %LOAD meter for security, cracked lens, corrosion, and other damage.