4-16. TIE DOWN I HOIST RING MAINTENANCE
This task covers removal, inspection, testing, and installation
INITIAL SETUP
Tools:
Equipment Condition:
Shop Equipment, Automotive Maintenance
APU Shut Down
and Repair (Item 1, App. B)
NATO Plug Disconnected
Parts/Materials:
Adhesive, Silicon (Item 2, App. E)
A. REMOVAL.
NOTE
Discard and replace all lockwashers
and locknuts when removed.
1.
Open top rear cover on enclosure by turning
latches.
2.
To remove hoist ring (1, Figure 4-6), you must first
remove the APU cover assembly (Para. 412).
3.
Remove hoist ring (1) and blocks (2) from cover
assembly cross member by removing screws (3),
washers (4), and locknuts (5). Remove rubber strip
(6).
4.
To remove left hand tie down ring (7), you must first
remove the local control panel (Para. 4-20).
5.
Remove left hand tie down ring (7) from rear panel
of enclosure (8) by removing screws (9) and
locknuts (10). Remove gasket (11).
6.
To remove right hand tie down ring (7), you must
first remove the fuel module (Para. 4-32).
7.
Remove right hand tie down ring (7) from rear
panel of enclosure (8) by removing screws (12) and
locknuts (10). Remove gasket (11).