ARMY TM 9-6115-639-13
AIR FORCE TO 35C2-3-386-51
MARINE CORPS TM 10155A-13/1
4-21. DC CIRCUIT BREAKER MAINTENANCE
This task covers removal, inspection, and installation.
INITIAL SETUP
Tools:
Equipment Condition:
Tool Kit, General Mechanics Automotive
Generator set shut down (Para. 2-9)
(Item 2, App. B, Sect. III)
Battery cables disconnected
Cable disconnected for SLAVE RECEPTACLE
A. REMOVAL.
1.
Turn quarter-turn fasteners (1, Figure 4-12) to
unlock and open control panel (2).
2.
Tag and disconnect electrical wiring from the rear
of DC CIRCUIT BREAKER switch (3).
3.
Remove DC CIRCUIT BREAKER switch (3)
from control panel (2) by removing attaching nut
(4) and lockwasher (5).
B. INSPECTION.
1.
Inspect DC CIRCUIT BREAKER switch for
corrosion and obvious damage.
2.
Inspect electrical wiring for cuts, crimps, bare
wire, or other damage. Ensure connectors are
securely attached.
3.
Remove and replace any component that is
damaged to the extent that it will effect the safe
operation of the generator set.
Figure 4-12. DC CIRCUIT BREAKER
C. INSTALLATION.
1.
Mate DC CIRCUIT BREAKER switch (3, Figure
4-12) to rear of control panel (2). Secure using
nut (4) and lockwasher (5).
2.
Connect electrical wiring to the rear of DC
CIRCUIT BREAKER switch (3).
3.
Close control panel (2) and lock in place using
quarter-turn fasteners (1).
4-43