ARMY TM 9-6115-639-13
AIR FORCE TO 35C2-3-386-51
MARINE CORPS TM 10155A-13/1
4-19. OPERATOR SWITCH MAINTENANCE
This task covers removal, inspection, and installation.
INITIAL SETUP
Tools:
Equipment Condition:
Tool Kit, General Mechanics Automotive
Generator set shut down (Para. 2-9)
(Item 2, App. B, Sect. III)
Battery cables disconnected
Cable disconnected for SLAVE RECEPTACLE
A. REMOVAL.
1.
Turn quarter-turn fasteners (1, Figure 4-10) to
unlock and open control panel (2).
2.
Tag and disconnect electrical wiring from the rear
of operator switches (3, 6, 9, 12, 15) as required.
3.
Remove AUX FUEL switch (3) from control
panel (2) by removing attaching nut (4) and
lockwasher (5).
4.
Remove PREHEAT switch (6) from control panel
(2) by removing attaching nut (7) and lockwasher
(8).
5.
Remove START / RUN / STOP switch (9) from
control panel (2) by removing attaching nut (10)
and lockwasher (11).
6.
Remove CIRCUIT INTERRUPTER switch (12)
from control panel (2) by removing attaching nut
(13) and lockwasher (14).
Figure 4-10. Operator Switches
(Sheet 1 of 2)
4-39