4-16. VOLTAGE METER MAINTENANCE
This task covers removal, inspection, and installation.
INITIAL SETUP
Tools:
Equipment Condition:
Tool Kit, General Mechanics Automotive
Generator set shut down (Para. 2-9)
(Item 2, App. B, Sect. III)
Battery cables disconnected
Cable disconnected for SLAVE RECEPTACLE
A. REMOVAL.
1.
Turn quarter-turn fasteners (1, Figure 4-7) to
unlock and open control panel (2).
2.
Tag and disconnect electrical wiring from the rear
of VOLTAGE meter (3).
3.
Remove VOLTAGE meter (3) from control panel
(2) by removing three screws (4), lockwashers
(5), and nuts (6).
B. INSPECTION.
1.
Inspect VOLTAGE meter for corrosion and
obvious damage. Inspect for broken glass.
2.
Inspect electrical wiring for cuts, crimps, bare
wire, or other damage. Ensure connectors are
securely attached.
3.
Remove and replace any component that is
damaged to the extent that it will effect the safe
operation of the generator set.
Figure 4-7. VOLTAGE Meter
C. INSTALLATION.
1.
Mate VOLTAGE meter (3, Figure 4-7) to control
panel (2). Secure using three screws (4),
lockwashers (5), and nuts (6).
2.
Connect electrical wiring to the rear of
VOLTAGE meter (3).
3.
Close control panel (2) and lock in place using
quarter-turn fasteners (1).
4-36