(5) Position beveled washers (5) so that screw heads are parallel to tops of washers. While holding beveled
washers in position, tighten hardware.
(6) Connect generator set ground wire (1) to trailer GROUND TERMINAL stud (3).
TM 5-6115-627-14&P
Section IV. MAINTENANCE OF ELECTRICAL SYSTEM
5-6. Power Cable Repair. The power plant cables are repaired by resoldering or replacing loose or
damaged contacts inside the connector. A soldered contact can be unsoldered and a new one installed in its
place. If, however, the damaged contact is crimped onto the wire, or if the wire is broken, the contact must be cut
off. When one wire in the cable has been cut or broken, all wires must be cut to the same length and new
contacts soldered on each. Refer to TB SIG 222 and TM 55-1500-323-25.
a. Removal.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
NOTE
Cable grip nut is left hand threaded. Turn clockwise to loosen.
Unscrew cable grip nut (1, figure 5-5) from housing (2).
Slide cable grip nut (1), packing gland (3) and collar (4) up cable (5) away from housing (2).
Remove three screws (6) and three washers (7) and separate housing (2) from plug shell (8).
Remove spacer (9) and insert (10) from plug shell (8).
Remove contact(s) (11 ) being repaired or replaced from spacer (9) and insert (10). Unsolder contact(s)
(11) from wire(s) (12).
NOTE
If contact is crimped onto wire, or if wire is broken, do steps (6) through (8).
Cut contacts (11 ) off wires (12).
Strip back cable jacket to expose more of individual wires.
Cut wires to equal length. Strip and tin wires in accordance with procedures given in technical manuals
referenced above.
5 - 5