TM 9-6150-226-13
4-14 LANYARD, PANEL BOARD, AND CIRCUIT BREAKERS.
(cont)
3.
4.
5.
6.
PERFORM CONTINUITY TEST.
WARNING
Do not attempt continuity
check with the power on.
Death or serious injury
may result.
NOTE
If you have PDISE equip-
ment, follow instructions
in paragraph 5b and 6.
Refer to Table 4-4 and perform
continuity test on the feeder/
distribution center.
INSTALL CIRCUIT BREAKER PANEL.
Install circuit breaker panel (11)
and secure with screws (9).
Connect phase indicator lights (10)
and remove tags.
Torque bus bar
lugs in accordance with Table G-1.
INSTALL COVER PANEL.
a.
Install inspection cover (6)
and secure with screws (5).
b.
Install panel cover (8) and
secure with screws (7).
INSTALL LANYARDS.
Install lanyards (4) on box and
lid and secure with washers (3),
nuts (2), and screws (1).
4-42