TM 9-6115-730-24
UNIT (FIELD) LEVEL MAINTENANCE
TACTICAL QUIET GENERATOR 200 kW, 50/60 Hz MEP-809A/PU-809A
REPROGRAMMING
INITIAL SETUP:
Personnel Required
Equipment Condition
One
TQG is not operating and powered down
References
REPROGRAMMING DVR PARAMETERS FOR VOLTAGE AND FREQUENCY CHANGE
The following procedure is used if the voltage and frequency settings for the generator set must be changed
because of mission requirements. When that occurs, the reconnection board must be repositioned (WP 0014) and
the DVR must be reprogrammed for specified frequency and voltage.
1. Set Battery Disconnect Switch to ON.
2. Set DEAD CRANK SWITCH to NORMAL.
3. On EMCP, set ENGINE CONTROL switch to COOL DOWN/STOP.
4. Select reprogramming data from Table 1 below according to the desired output voltage and desired
frequency. Mission requirements will define requirements.
Table 1. 200 kW TQG DVR Voltage and Frequency Programming Parameters and Setpoints.
DESIRED OUTPUT
DVR PARAMETER NUMBER
VOLTS
HERTZ
:01
:02
:03
:04
:05
:06
120/208
60
217
1.0
0
694
4.34
58.8
120/208
50
205
1.0
0
578
3.61
49.8
240/416
60
434
2.0
0
347
4.34
58.8
240/416
50
410
2.0
0
289
3.61
49.8