TM 9-6115-729-24
0109
REMOVAL - Continued
2. Remove two plugs (Figure 1, Item 4), pipe plug (Figure 1, Item 5), and plug (Figure 1, Item 6).
END OF TASK
INSTALLATION
1. Install plug (Figure 1, Item 6), pipe plug (Figure 1, Item 5), and two plugs (Figure 1, Item 4).
2. Apply sealing compound to contact surface of flywheel housing (Figure 1, Item 3) and install flywheel housing,
ten screws (Figure 1, Item 2), and two screws (Figure 1, Item 1).
3. Torque two screws (Figure 1, Item 1) to 33-47 lb-in (45-65 Nm). Torque ten screws (Figure 1, Item 2) to
98-144 lb-ft (130-190 Nm).
END OF TASK
END OF WORK PACKAGE