ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
BOLT
LOCKWASHER
WASHER
PREHEATER
NUT
LEAD
ELEMENTS
e. Installation.
(1) Route preheater lead (Figure 4-62) as removed. Use new cable ties to secure lead
where required.
(2) Connect preheater lead at air intake heating elements stud with nut. Then connect
other end to engine with bolt, lockwasher, and washer.
GROUND STUD TERMINAL.
a. Inspection.
(2) Inspect the ground stud terminal for deformed threads, corrosion, or other physical
damage.
(3) Ensure that the connections to the terminal are clean and tight.
Replace if
defective.
b. Removal.
(2) Disconnect ground wire from ground stud terminal (Figure 4-63) as necessary.
(3) Hold terminal body hex with wrench and remove locknut, washer, and ground stud