ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
(6)
Wipe oil and dirt from generator set and store in a dry place.
(7)
Preserve generator sets in accordance with levels A, B, or C of ASTM D 3951-98.
PACKING.
Before shipping the 2 kW Generator Set, it should be packed in accordance with "Special Packaging
MARKING.
Mark for shipment or storage in accordance with MIL-STD-129.
USE OF CORROSION-PREVENTIVE COMPOUNDS, MOISTURE BARRIERS, AND
DESICCANT MATERIALS.
Refer to MIL-HDBK-729 for corrosion and corrosion prevention/metal.
STORAGE.
Refer to TB 740-97-2/TO 35-1-4 for storage information. Do not stack more than three (3) units high.
SPECIAL INSTRUCTIONS FOR ADMINISTRATIVE STORAGE.
Placement of equipment in administrative storage should be for short periods of time when a shortage of
maintenance effort exists. Items should be in mission readiness within 24 hours or within the time factors
as determined by the directing authority. During the storage period, appropriate maintenance records
shall be kept.
If the generator has been removed from its original packaging, checks and services should be completed.
Shortcomings and deficiencies should be corrected, and all Modification Work Orders (MWO) should be
applied before placing the generator into administrative storage.
Inside storage is required for items selected for administrative storage.