1. Load Terminal Board
7. Washer
2. Locknut
8. Screw
10
3. P. Clamp
9. Screw
4. Ground Strap
10. Screw
OP
5. Nut
ER
ATI
NG
INS
9
TR
UC
TI
6. Lockwasher
8
7
6
5
T
R
STA
F
OF
EAT
EH
PR
1
RT
STAEAT
EH
PR
CA
UT
IO
120 N
VD
C
7
6
5
4
7
2
7
6
5
3
7
6
5
Figure 4-39. Load Terminal Board (MEP-501A and Mechron
Sets)
(3) Install washers (7), lockwashers (6), nuts (5), and electrical wiring with p-clamp (3)
on screw (8).
ON-OFF LOAD CIRCUIT BREAKER ASSEMBLY AND BOOT.
a.
Inspection.
(2) Release instrument panel by turning fastener, open instrument panel slowly.
(3) Inspect ON-OFF load circuit breaker assembly for security, cracks, corrosion, and
other damage.
(4) Close and secure instrument panel.
b.
Testing. (MEP-531A)
(2) Release instrument panel by turning fastener, open instrument panel slowly.