TM5-6115-640-14&P
(2)
Runners.
(a)
Remove eight screws (12) from long clamp runner (13); or remove six screws (12) from short clamp runner
(14).
(b)
Remove 15 screws (16) from runner (15) and take off runner.
(c)
Position new runner (15) on rack assembly (5) and secure with 15 screws (16).
(d)
Install long clamp runners (13) and secure with eight screws (12) or install short clamp runners (14) and
secure with six screws (12).
(3)
Strap Fastener.
(a)
Drill out solid rivets (18) securing strap fastener (17) to rack assembly (5).
(b)
Remove strap webbing (19) from strap fastener.
(c)
Place new strap fastener (17) through strap webbing (19) loop and position strap fastener on rack assembly
and secure with solid rivets (18).
(d)
Touch up with paint as required.
b.
Removal. Power Plant AN/MJQ-32 contains a stowage rack for transporting the antenna accessories. (See
figure 4-13.)
(1)
Remove 16 locknuts (1, figure 4-13), 32 washers (2), 4 plates (3), and 16 screws (4).
(2)
Remove rack (5) from trailer.
c.
Installation.
(1)
Position rack (5) on trailer.
(2)
Install 16 screws (4), 16 flat washers (2), 4 plates (3), 16 flat washers (2), and 16 locknuts (1).
(3)
Tighten hardware and secure rack to trailer.