TM 5-6115-640-14&P
e.
Inspecting Power Plants AN/I)Q-32 and AN/UMQ-33.
(1)
Refer to Service Upon Receipt of Materiel in TM5-6115-615-12 for initial inspection procedures for
generator sets.
(2)
Refer to Service Upon Receipt of Materiel in TM9-2330-202-14&P for initial inspection procedures for
trailer.
f.
Servicing Power Plants AN/MJQ-32 and AN/MJQ-33.
(1)
Remove the depreservation guide. The depreservation guide explains what was done to the equipment
prior to packaging and what has to be done to place the power plants into operation.
(2)
Refer to paragraph 4-le(1) and (2) for initial servicing procedures for the generator sets and trailer.
4-2. INSTALLATION (SEE FIGURE 4-1).
Installation of the power plants AN/MJQ-32 and AN/MJQ-33 at a worksite involves positioning the trailer and grounding
the power plants. Since both power plant installation procedures are alike, only the AN/MJQ-33 will be shown in figure 4-3.
a.
Positioning Power Plant. Position the power plant on the worksite as follows:
(1)
Select an area as level as possible to install power plant and position trailer.
(2)
Set trailer handbrakes and lower trailer support leg.
(3)
Chock both wheels and lower rear leg prop assembly. Adjust leg prop assembly by turning inner leg until
leg base makes firm contact with ground.
(4)
Lift and secure the tarpaulin (AN/MJQ-33 only) in raised position away from generator set exhaust.
WARNING
Remove fire extinguishers and fuel cans prior to start-up of generator. This will ensure that in
the event of fire extra fuel will not be involved and extinguisher will remain accessible.
(5)
Locate fuel cans and fire extinguisher on ground away from power pl ant.
4-4