TM 5-6115-640-14&P
WARNING
Bow assembly will fall and cause injury to personnel if not supported before cutting away steel
strappings.
(1)
Remove and set aside packing list and shortage packing list (if applicable) from side of one of the
generator crates.
(2)
Supporting bow assembly, cut away steel strappings which secure bow assembly to trailer and to each
other.
(3)
Remove individual bows by sliding each one forward and out of their supporting wooden braces.
(4)
Remove wooden braces from bow pockets by removing each of the quick-release pins.
(5)
Using metal cutters, cut away steel strapping from rear generator crate.
(6)
Remove both front and rear generator crates from trailer.
(7)
Remove tarpaulin package located under one of the generator crates and remove tarpaulin from its plastic
storage.
(8)
Cut away steel strappings from switchbox crate and remove crate.
(9)
Remove and retain all tags from components for informational purposes.
(10)
Remove all plastic tie-wraps necessary to place power plant into operation.
d.
Unpacking Power Plant AN/MJQ-33 (Stateside: Classification B/C).
(1)
Remove packing list and shortage packing list (if applicable) from plywood placard situated in front of
rolled-down tarpaulin.
(2)
Cut away plastic tie-wraps and unfasten tarpaulin nylon strappings supporting placard and remove placard.
(3)
Roll up tarpaulin (paragraph 3-6a(1)(a) thru (d)). Remove tarpaulin if desired (paragraph 3-6a(1)(e)).
(4)
Remove and retain all tags from components for informational purposes.
(5)
Remove all plastic tie-wraps necessary to place power plant into operation.
4-3