TM 5-6115-640-14&Pf.Stow any remaining authorized equipment for the AN/MJQ-32 on designated areas of the AN/MJQ-32.g.Secure fire extinguisher and fuel cans in their respective mounting brackets.h.Lower and secure tarpaulin in place on the AN/MJQ-33 power plant.i.Place antenna and antenna accessories into stowage rack (AN/MJQ-32) and on mast mounts and supports.Secure in place.j.Remove locking pin from leg prop assembly on rear of trailers. Swing leg prop back and up into travelingposition and secure with pin.k.Attach power plant to towing vehicle. (Refer to TM 9-2330-202-14&P).l.Release trailer handbrakes.4-4. REINSTALLATIONAFTERMOVEMENT.After movement to a new worksite, install power plants in accordance with paragraph 4-2.Section II. REPAIR PARTS, SPECIAL TOOLS, SPECIAL TEST, MEASUREMENT ANDDIAGNOSTIC EQUIPMENT (TMDE)4-5. TOOLSANDEQUIPMENT.There are no special tools or equipment required to maintain the AN/MJQ-32 and AN/MJQ-33 power plants.4-6. MAINTENANCEREPAIRPARTS.Repair parts for maintenance of these power plants are listed and illustrated in the repair parts and special tools list inAppendix C of this manual.Section III. LUBRICATION INSTRUCTIONS4-7. GENERAL.Detailed instructions for the lubrication of the major components of the power plants are contained in the applicableLubrication Orders (LO's). Refer to DA Pam 25-30 to ensure that the latest editions of the LO's are used. This sectioncontains lubrication instructions that are not included in the Lubrication Orders.4-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business