TM 5-6115-640-14&P
(8)
Using the packing list previously removed in step (1) above, inventory the items in BIIL box and all other
accessories. Check missing items against shortage packing list (if sent). Report any discrepancy to your
supervisor.
(9)
Remove and retain all tags from components for informational purposes.
(10)
Remove all plastic tie-wraps necessary to place power plant into operation.
b.
Unpacking Power Plant AN/NJQ-32 (Stateside: Classification B/C).
(1)
Remove and set aside the packing list and shortage packing list (if applicable) from plywood placard
located in front of front generator.
(2)
Unfasten stowage rack nylon strappings and remove placard.
WARNING
Steel strapping used in packaging of the power plant has sharp edges. Care should be taken
when cutting and handling strapping to avoid injury to personnel.
WARNING
Basic Issue Items List (BIIL) box weighs approximately 125 pounds. Use at least two men when
removing box from stowage rack to avoid injury to personnel.
(3)
Perform steps (3) thru (10) in a above.
c.
Unpacking Power Plant AN/MJQ-33 (Overseas: Classification B/A).
WARNING
Steel strapping used in packaging of the power plant has sharp edges. Care should be taken
when cutting and handling strapping to avoid injury to personnel.
4-2