TM 9-6150-228-13&P
INSTALLATION
a. Position connector (10) and new gasket (11) in opening on power distribution panel enclosure (12).
b. Position connector cover chain under lower-left hand screw. Install four screws (8) and lock washers (9). Tighten
screws.
c. Install cover (7) on connector (10).
d. Position connector neutral and ground wires (6) on associated bus bars (5) and install screws (4).
e. Install three connector wires (3) in output terminals (1) of associated circuit breaker (2) with phase markings matching
wires on input terminals.
f. Torque screws to 275 in.-lb (31.4 Nm) for 400-amp circuit breaker and 45 in.-lb (5.1 Nm) for 60 and 1 00-amp circuit
breakers.
g. Remove tags.
4-39