TM 9-6150-226-13
(23) Service/feeder cable, 50 ft (15.2 m), 100-amp, 8-pin
(24) Service feeder cable, 100 ft (30.4 m), 40/60-amp, 5-pin
(25) Service/feeder cable, 100 ft (30.4 m), 60-amp, 4-pin
(26) Universal adapter
(27) Utility light, 120 V, dual socket, incandescent
(28) Interface cable, 40/60-amp, 5-ton expando van
(29) Interface cable, 20-amp, general illumination light set
(30) Cable carrying strap (double), 200-amp
2-10.
PREPARATION FOR MOVEMENT.
WARNING
High voltage is present in this system.
DISE and PDISE
supports equipment using 120/208 V ac.
Do not attempt to
disconnect the equipment with the electrical power on.
Death or severe injury may result.
CAUTION
Dirt and contamination may plug connector sockets.
Secure
cap on connectors when disassembling the equipment.
a.
Shut down the DISE or PDISE system (para 2-8e).
b.
Starting at the users end, disconnect the users equipment.
c.
Disconnect the lights and branch circuit cables.
d.
Disconnect the extension cables.
e.
Disconnect the service/feeder cables.
f.
Disconnect the pigtail cables.
Install the connector caps and perform the after preventive
maintenance checks and services in table 2-1.
h.
Coil the service/feeder cables up and attach cable carrying straps.
i.
Store the pigtail, extension,
and branch circuit cables along with
the lights, plugs, and receptacle boxes in the transit storage containers, 200-
amp.
2-45
