TM 9-6150-226-13
connector should connect to which load for each center.
Perform the following steps to
ensure proper phase balancing:
(1) Connect all 1 three-phase loads first.
(2) Connect the largest single-phase loads.
(3) Connect the next largest single-phase load to the phase with the least
amperage.
(4) Continue connecting the single-phase loads, largest to smallest until all
loads are connected.
NOTE
The following chart will show the proper connections and correct
phase balancing of the M40 or M40 A/P used in the example in Table
2-3 and figure 2-5 and figure 2-6.
Table 2-4.
EXAMPLE OF LOAD ASSIGNMENTS FOR THREE/SINGLE-PHASE OUTPUT
CONNECTORS OF THE M40 OR M40 A/P
NOTE
The power distribution plan is now complete and assembly of
the DISE or PDISE network can be performed.
Before
deployment, test the power distribution plan in garrison.
2-33