TM 9-6115-730-24
0095
INSTALLATION - Continued
5. Install 12 lockwashers (Figure 1, Item 5) and screws (Figure 1, Item 4). Torque twelve screws (Figure 1,
Item 4) to 41-49 lb-ft (56-66 Nm).
6. Install eight lockwashers (Figure 1, Item 3) and screws (Figure 1, Item 2). Torque eight screws (Figure 1,
Item 2) to 63-77 lb-ft (86-104 Nm).
7. Torque two screws (Figure 1, Item 8) to 216-264 lb-ft (293-358 Nm).
8. Connect wiring to generator (Figure 1, Item 1).
11. Install rear section housing assembly (WP 0035).
12. Install generator access cover assembly (WP 0033).
13. Install engine generator compartment ceiling assembly (WP 0032).
14. Install rear roof section housing assembly (WP 0031).
15. Install front roof section housing assembly (WP 0030).
16. Install right rear door assembly (latch) (WP 0028).
18. Install left rear door assembly (latch) (WP 0023).
END OF TASK
END OF WORK PACKAGE
0095-4