ARMY TM 9-6115-671-14
AIR FORCE TO 35C2-3-446-32
MARINE CORPS TM 09249A/09246A-14
4-133
a. Inspection.
(1)
Shut down generator set, paragraph 2.11.2.
(2)
Remove DCS control box top panel, paragraph 4.7.2.
(3)
Attach ESD wrist strap and connect to ground.
(4)
Inspect connectors on CIM wiring harness (44, Figure 4-16) for cracks, corrosion, bent or broken
pins, and obvious damage.
(5)
Inspect ribbon cable insulation for burns, deterioration, chafing, and splitting.
(6)
Disconnect ESD wrist strap, and remove wrist strap.
(7)
Install DCS control box top panel, paragraph 4.7.2.
b. Removal.
(1)
Shut down generator set, paragraph 2.11.2.
(2)
Open BATTERY ACCESS door (Figure 1-2), and disconnect negative battery cable.
(3)
Remove DCS control box top panel, paragraph 4.7.2.
(4)
Remove CIM. Refer to paragraph 4.8.16.
(5)
Attach ESD wrist strap and connect to ground.
CAUTION
CIM wiring harness has multi-pin electrical connectors. Pins can be damaged
or broken if connectors are pulled from or inserted into sockets at an angle.
Use care when connecting or disconnecting wiring harness to components.
Failure to comply can cause damage to equipment and malfunction of the CIM.
(6)
Carefully disconnect CIM wiring harness connectors from components, and remove CIM wiring
harness (44, Figure 4-16) from DCS control box assembly.
c. Testing.
(1)
Remove CIM wiring harness, 4.8.38. b. Leave ESD wrist strap on.
(2)
Set multimeter for ohms, and test individual wires of CIM wiring harness (44, Figure 4-16) for
continuity by testing pin-to-pin at wiring harness connectors. Refer to Wire Harness FO-7. If
continuity is not indicated, replace wiring harness.
(3)
Install CIM wiring harness, 4.8.38.d.
