ARMY TM 9-6115-670-14&P
5-97
f. Install wiring harness (4) through hole inside of control unit box (3).
g. Secure connector J2 (2) to control unit box (3) with four socket head screws (1) and nuts (5).
h. Install electrical leads and remove tags.
i. Slide insulation sleeving over soldered connections. Use heat gun to shrink sleeving and
secure soldered connections (JTACS and WIN-T).
j. Secure wiring harness with wire ties as needed.
k. Install APU control unit front panel and secure with ten screws (6).