ARMY TM 9-6115-670-14&P
5-96
Table 5-5. Wiring Harness J2 Continuity Test
Termination
Termination
Termination
Wire Ref
No.
From
To
Wire Ref
No.
From
To
Wire Ref
No.
From
To
1
J2-A
ACA
9
J2-J
BSS1
17
J2-S
ESS1
2
J2-B
ACA+
10
J2-K
WTRS
18
J2-T
MOOS4
3
J2-C
ACV
11
J2-L
ACS3
19
J2-U
TP1-2
4
J2-D
ACV+
12
J2-M
TP1-1
20
J2-V
GND
5
J2-E
P2
13
J2-N
SPS1
21
J2-W
BSS6
6
J2-F
P3
14
J2-P
DCA
22
J2-X
TBS-5
7
J2-G
AUX1
15
J2-Q
DCA+
23
J2-Y
TBS-4
8
J2-H
AUX2
16
J2-R
SPS4
24
J2-Z
TBS-3
REPAIR
Refer to para 5.25. to repair APU DC BOX Wiring Harness J3.
REPLACE
a. Identify and tag electrical leads.
b. Cut and remove wire ties as necessary to remove wiring harness (4).
c. Remove non-soldered electrical leads.
d. Remove four socket head screws (1) and nuts (5) securing connector J2 (2) to control unit box
(3).
e. Carefully pull connector J2 (2) and wiring harness (4) through hole inside of control unit box (3).
CAUTION
Take care not to cut wires or other APU components
when removing tiedown straps.
NOTE
Cut and remove tiedown straps as needed to remove
wiring harness.
NOTE
When removing, make note of tiedown strap locations.
Wiring harness will need to be secured at
approximately the same places.