TM 9-6115-670-14&P
5-93
f. Position new gauge (2) in APU control unit front panel (5) mounting hole.
g. Secure gauge (2) to mounting bracket with two nuts and lock washers (4).
h. Install terminal leads (3) on terminals and remove tags.
i. Secure APU control unit cover (5) to chassis with ten screws, (caged nuts (SICPS), machine
screws (JTACS and WIN-T)) (1).
j. Install APU control unit.