TM 9-6115-669-13&P
5.8 POWER CABLE (ECS POWER SET) MAINTENANCE.
This task covers:
a.
d.
Removal
Repair
b.
Inspection
c.
Test
e.
Installation
INITIAL SETUP
Tools
Equipment Conditions
General Mechanics Tool Kit
(item 2, appendix B)
Automotive Fuel and Electrical System Repair, Tool
Kit (item 3, appendix B)
High voltage tester
Insulation tester
Resistance tester
Reference
Shut down Generator Set
150 kW, paragraph 2.8.1.
Load Bank (item 23, appendix B)
Materials/
P a r t s
Personnel Required
Solder (item 7, appendix E)
TWO
WARNING
The Generator Sets 160 kW produce lethal voltages.
Turn off power to the EPP III or Generator Set 150 kW before
performing any installation, removal, disassembly, or
assembly work.
Wear protective gloves when performing any work on main
assemblies of the EPP III.
CAUTION
Label all cables before removing electrical or electronic assemblies or
components.
REMOVAL
N O T E
This procedure is the same for all power cables.
a.
Swing cable drum into operating position and lock in place.
b.
Refer to paragraph 4.13 for removal of cable from cable drum.
5-20
Change 1
