TM 9-6115-669-13&P
INSTALLATION
CAUTION
Cable should be installed so chafe pad is located under the cable clamp
on the drum.
a. Refer to paragraph 4.13 for installation of cable on cable drum.
Table 5-2 Power Cable Wiring Layout.
Signal
Prime Power A (L1)
Prime Power B (L2)
Prime Power C (L3)
Prime Power Neutral
(N)
Enable
Prime Power Enable
Safety Ground
Safety Ground
General Shield
Plug pin
A
A
C
C
G
G
E
B
B
D
D
H
F
Housing
Conductor No.
Color
1
wt
4
wt
2
wt/rd
5
wt/rd
3
wt/bk
6
wt/bk
7
wt/br
8
11
9
12
10
18
wt/or
wt/bl
wt/ye
wt/vio
wt/gn
wt/gr
silver/metallic
b.
Connect load bank to generator set and perform procedures in paragraph 4.34.
I
Change 1
5-23