TM 9-6115-669-13&P
k. Slide parts (10 and 11) and screw onto part (9).
l.
Place cable shield over part (11) and push onto part (12).
m. Push part (13) over part (12) and screw onto part (11).
n.
o
p.
q.
r.
s.
t.
Screw parts (14) and (11) together.
Place part (16) in part (14).
Slide part (16) into part (14).
Slide part (17) into part (14).
Screw parts (18) and (14) together.
Position heat shrink tubings (2, 7) with labels (6).
Position heat shrink tubing (4) with 2.73 x 1.95 inch (70 x 50 mm) rubber flap (3) on EPP III
plug end.
u
Assembly of ECS plug end is the same procedure as EPP III end.
v
Test cable as indicated in steps above.
5-27