TM 9-6115-669-13&P
5.9 CONTROL CABLE MAINTENANCE.
This task covers:
a.
d.
Removal
b.
Inspection c. Test
Repair
e.
Installation
INITIAL SETUP
Tools
Equipment Conditions
General Mechanics Tool Kit
(item 2, appendix B)
Automotive Fuel and Electrical System Repair,
Tool Kit (item 3, appendix B)
High voltage tester
Insulation tester
Resistance tester
Reference
Shut down Generator Set
150 kW, paragraph 2.8.1.
Load Bank (item 23, appendix B)
Materials/Parts
Personnel Required
Solder (item 7, appendix E)
TWO
The Generator Sets 150 kW produce lethal voltages.
Turn off power to the EPP III or Generator Set 150 kW before
performing any installation, removal, disassembly, or
assembly work.
Wear protective gloves when performing any work on main
assemblies of the EPP III.
N O T E
Label all cables before removing electrical or electronic assemblies or
components.
REMOVAL
For removal of cable from cable drum, refer to paragraph 4.15.
INSPECTION
Check plugs and the entire outer surface of the cable for external damage. Plug pins and sockets
must not be charred or broken. Plug housing threads must be undamaged. Cable length is
approximately 104.98 ft (32 m).
Change 1
5-25