ARMY TM 9-6115-643-24
AIR FORCE TO 35C2-3-445-22
d Replace unreadable data plates.
e. Replace loose or missing rivets,
2.14.4. Installation
a.
Install latches (25, FIGURE 2-5) in left side engine access door (6) with screws (24) and assembled nuts (23).
b. Install bracket (22) on engine access door (6) with bolts (21) and assembled nuts (20).
c.
Install bracket (18) and holding rod (19) on engine access door (6) with bolts (17) and assembled nuts (16).
d
Assemble top air baffle (12) to bottom air baffle (13) with assembled nuts (14) and bolts (15).
e
Install air baffles (12) and (13) on engine access door (6) with bolts (11) and assembled nuts (10)
f.
Install fuel system diagram plate (27) on document box (9) with rivets (26).
g
Install document box (9) with bolts (8) and assembled nuts (7).
h
Install right side engine access door (6) and hinges (5) on generator set with bolts (3), washers (4), lockwashers
(2), and nuts (1).
I .
Close left side engine access door
2.15.
CONTROL BOX TOP PANEL
2.15.1.
Removal
a Shut down generator set
b
Open battery access door and disconnect negative battery cable
c
Remove control panel access door, paragraph 2.14.1.
d.
Lower control panel and remove bolts (1, FIGURE 2-6), flatwashers (2), lockwashers (3), and assembled nuts (4)
from top panel (5).
The control box top panel is attached to the generator set with a silicone
sealant to prevent water from entering the control box. Care must be
taken not to bend or scratch the control box top panel when separating.
e
Separate and remove control box top panel (5) by prying to break loose sealant
f
If damaged, remove gasket (15).
g.
Remove bolts (6), washers (7), lockwashers (8) nuts (9), and stiffener (10) from control box assembly.
h
Remove bolts (11), assembled nuts (12), bracket (13), and ring (14) from control box top panel (5).
2.15.2.
Inspection.
a Shut down generator set.
b
Open battery access door and disconnect negative battery cable
2-36