ARMY TM 9-6115-643-24
AIR FORCE TO 35C2-3-445-22
d.
Disconnect interconnect battery cable terminals (6) and (7) and remove interconnect battery cable
assembly.
e.
Disconnect positive battery cable terminal lug (8).
Ensure proper lifting techniques are used when lifting batteries. Failure to observe
this warning could result in personal injury.
f.
Remove nuts (9) washers (IO), lockwashers (14), hook bolts (II), and retaining bar (12).
g. Remove batteries (13).
2-12-3. Inspection.
a. Remove batteries.
b. Inspect batteries for cracked cases, broken, burned or corroded posts, missing parts, and other
damage.
c. Install batteries.
2-12-4. Service.
a.
Remove terminal covers (2, FIGURE 2-3).
b.
Clean cable terminal lugs and battery posts
c.
Install terminal covers (2) on batteries (13)
2-12-5. Installation.
a. Position batteries (13, FIGURE 2-3) in generator set. Ensure that batteries are serviced and fully
charged.
b.
A ply general purpose grease (Item 9, Appendix C) to battery posts and cable terminal lugs (1), (6),
(7), and (8).
c.
Install hook bolts (11) and retaining bar (12) with lockwashers (14) washers (IO), and nuts (9).
Connect negative battery terminal (1) last when installing battery cables. Failure to
follow this procedure could result in sparks which can ignite volatile battery gases.
d.
Connect positive cable terminal lug (8).
e.
Position interconnect battery cable connect terminals (6) and (7).
f.
Connect negative battery cable terminal lug (1) and close battery compartment access door.
2-13. NATO SLAVE RECEPTACLE.
2-13.1. Inspection.
a. Shut down generator set.
b.
Open left side engine access door.
c.
Inspect NATO slave receptacle for security, corrosion, missing hardware, and other damage
d. Close access door.
Change 4 2-31