TM 5-6115-640-14&P
c.
Installation.
(1)
Installation (Curbside).
(a)
Position fender/fender extension (15, figure 5-5) on trailer frame (13). Use support, if necessary.
(b)
Install 5 screws (3), 10 flat washers (2), and 5 locknuts (1) and secure inner edge of fender/fender
extension to trailer frame.
(c)
Secure cross braces (14) to fender/fender extension with four screws (6), eight flat washers (5), and
four locknuts (4).
(d)
Install four screws (9) and four flat washers (8) through center portion of fender/fender extension and
secure with four flat washers (8) and locknuts (7).
(e)
Install six screws (12) and six flat washers (11) through remainder of fender/fender extension and
secure with six flat washers (11) and locknuts (10).
(f)
Install stowage rack assembly (paragraph 4-26b(2)).
(g)
Install cable-reel bracket (paragraph 4-31c).
(h)
Install fuel-adapter holder (paragraph 4-33b).
(I)
Install spout, can, holder (paragraph 4-32b).
(j)
Install antenna-mast mount (paragraph 4-30b).
(k)
Install fuel can bracket (paragraph 4-27(2)).
(l)
Install power cable brackets (paragraph 4-38b).
(2)
Installation (Roadside).
(a)
Perform steps a thru f in c(1) used in the above curbside installation, using fender/fender extension
(16).
(b)
Install antenna mast mount (paragraph 4-30b).
(c)
Install driver/puller holder (paragraph 4-36b).
(d)
Install fire extinguisher bracket (paragraph 4-28b).
(e)
Install switchbox bracket (paragraph 4-37b) and switch box (paragraph 4-19c(2)).
(f)
Install power cable brackets (paragraph 4-38b).
(g)
Install fuel can bracket (paragraph 4-27b).
5-14
