TM5-6115-640-14&P
Each of the two antenna mast supports is located directly in front of the antenna mast mounts on the trailer chassis.
a.
Removal.
(1)
Remove two locknuts (6, figure 4-16), four flat washers (7), and two screws (8), securing mast support (9) to
trailer frame (10).
(2)
Remove mast support from trailer frame.
b.
Installation.
(1)
Position mast support (9) on trailer frame (10).
(2)
Insert two screws (8) and two flat washers (7) through support and trailer frame.
(3)
Install two flat washers (7) and locknuts (6). Tighten hardware to secure mast support.
4-31. CABLE-REEL BRACKET REPAIR AND REPLACEMENT, AN/MJQ-32 ONLY
This task covers:
1. Repair
3. Installation
2. Removal
Initial Setup:
1.
Tools - General Mechanics Tool Kit (5180-00-177-7033)
- Riveter (5120-00 -148-5847)
2.
Materials/Parts - Cable-Reel Bracket (97403); 13217E2062
- Rivets (96906); MS9319-208
- Strapping (83149); MIL-W-530
The load-cable reel supplied with power plant AN/MJQ-32 is mounted in a cable-reel bracket. The bracket is located on
the rear curbside fender extension.
a.
Repair. Repair of the cable-reel bracket is by replacement of the strapping.
(1)
Remove strapping (11, figure 4-16) by removing rivet (12) holding strapping to cable-reel bracket (13).
(2)
Route one end of new strapping (11) through cable-reel bracket (13) slot and loop the strap end.
(3)
Connect looped end with rivet (12).
4-52