TB 11-6115-741-24
APPENDIX E (continued)
PREVENTATIVE MAINTENANCE CHECKS AND SERVICES (PMCS) CHECKLIST
PMCS and Parts Replacement IAW Applicable TMs unless otherwise
Date
specified
Completed
21
Replace light bulbs
22
On 5 & 10 KW Voltage Regulator only: A1, clean dust/sand from circuit card
23
On the 3 kW TQG, the Frequency Converter shall be cleaned then upgraded to the latest
OEM specification
24
On the 5 and 10 KW Mil Std sets, verify CR voltage/polarity at all three generator output
voltage connections.
Lubrication System
25
Replace oil and filter
Main Generator
26
If disassembled, replace bearing and o-ring (if applicable)
27
On the MEP-531A, inspect the brushes, caps, wires, and holders IAW the TM
and polish the slip rings.
Generator Set
28
Inspect and test batteries
29
Lubricate all hinges/latches
30
31
Inspect Acoustic Suppression Kit if applicable
Engine
32
Adjust valves IAW the applicable TM
33
On 5 & 10 KW TQG's, the metal/rubber hose fuel rail assembly (P/N's 186-6159 and
186-6160) shall be inspected and replaced as required.
Power Plant
34
Verify switch box functionality
Other PMCS items as specified in applicable TM shall be performed
E-2