TM 9-6150-226-13
Subject
Cable Assembly
Circuit Breaker
Section V.
UNIT MAINTENANCE PROCEDURE
Section Index
Assembly and Bus Bar
Connector Assembly
Duplex Receptacle and Cable
Dust and Moisture Sleeve
Gasket
General
Lanyard, Panel
Load Terminal
Mounting Board
Painting
Board, and Circuit Breakers
and Input Connector
Phase Indicator Light Assembly and Bulb
Plug, Switch, Sockets, and Lens
Plug, Switch, Sockets, and Reflector Guards
Rope Assembly
Scope Maintenance
Page
4-65
4-48
4-43
4-54
4-61
4-53
4-36
4-38
4-63
4-59
4-37
4-45
4-67
4-56
4-66
4-36
4-11.
SCOPE MAINTENANCE.
Unit maintenance replaces, repairs, and tests unserviceable components of
DISE and PDISE as authorized by the Maintenance Allocation Chart.
4-12.
GENERAL.
a.
Replace or repair defective components you discover during PMCS.
b.
To facilitate assembly and installation, apply identifying tags to
mating points of electrical lines when they are disconnected.
Figures 4-1 thru
4-11 show complete wiring diagrams for appropriate DISE and PDISE equipment.
For example of internal wiring inside the centers, see paragraph 4-10d for
identification.