TM 9-6115-730-24
0042
ASSEMBLY - Continued
11. Install screw (Figure 2, Sheet 3, Item 69), nut (Figure 2, Sheet 3, Item 67), two washers (Figure 2, Sheet 3,
Item 68), and nut (Figure 2, Sheet 3, Item 67)
12. Install component mounting channel (Figure 2, Sheet 3, Item 63), five washers (Figure 2, Sheet 3, Item 66),
lockwashers (Figure 2, Sheet 3, Item 65), and screws (Figure 2, Sheet 3, Item 64).
13. Install screw (Figure 2, Sheet 3, Item 62), nut (Figure 2, Sheet 3, Item 61), loop clamp (Figure 2, Sheet 3,
Item 60), and nut (Figure 2, Sheet 3, Item 61).
14. Install lower transformer mounting bracket (Figure 2, Sheet 3, Item 55), two washers (Figure 2, Sheet 3,
Item 59), two lockwashers (Figure 2, Sheet 3, Item 58), two screws (Figure 2, Sheet 3, Item 57), and nut
(Figure 2, Sheet 3, Item 56).
15. Install upper transformer mounting bracket (Figure 2, Sheet 3, Item 50), two washers (Figure 2, Sheet 3, Item
54), two lockwashers (Figure 2, Sheet 3, Item 53), two screws (Figure 2, Sheet 3, Item 52), and nut (Figure 2,
Sheet 3, Item 51).
16. Install AC transformer box A5 (Figure 2, Sheet 3, Item 45), four washers (Figure 2, Sheet 3, Item 49), four
lockwashers (Figure 2, Sheet 3, Item 48), four screws (Figure 2, Sheet 3, Item 47), and three fuses (Figure 2,
Sheet 3, Item 46). Record barcode values for VA, VB, VC, IA, IB, IC (setpoints AC01 thru AC06) for
reprogramming. GSC setpoints must be reprogrammed if AC transformer box A5 is replaced (WP 0081).
17. Install ground fault circuit interrupter GFCI (Figure 2, Sheet 3, Item 42), two screws (Figure 2, Sheet 3,
Item 44), and nuts (Figure 2, Sheet 3, Item 43).
18. Install nameplate (Figure 2, Sheet 2, Item 40), (Figure 2, Sheet 2, Item 39), or (Figure 2, Sheet 2, Item 38)
and two rivets (Figure 2, Sheet 2, Item 41).
19. Install paralleling receptacle (Figure 2, Sheet 2, Item 34), cover (Figure 2, Sheet 2, Item 37), four screws
(Figure 2, Sheet 2, Item 36), and four nuts (Figure 2, Sheet 2, Item 35). Repeat for other paralleling
receptacle.
20. Install duplex receptacle (Figure 2, Sheet 2, Item 31), cover (Figure 2, Sheet 2, Item 33), and four screws
(Figure 2, Sheet 2, Item 32).
21. Install load sharing module (LSM) A4 (Figure 2, Sheet 2, Item 28), four washers (Figure 2, Sheet 2, Item 30),
and screws (Figure 2, Sheet 2, Item 29).
22. Install overload/short circuit relay (Figure 2, Sheet 2, Item 24), four washers (Figure 2, Sheet 2, Item 27),
lockwashers (Figure 2, Sheet 2, Item 26), and screws (Figure 2, Sheet 2, Item 25).
23. Install bus transformer box A6 (Figure 2, Sheet 2, Item 19), four washers (Figure 2, Sheet 2, Item 23), four
lockwashers (Figure 2, Sheet 2, Item 22), four screws (Figure 2, Sheet 2, Item 21), and two fuses (Figure 2,
Sheet 2, Item 20). Record barcode value for VA (setpoint AC07) for reprogramming. GSC setpoints must be
reprogrammed if bus transformer box A6 is replaced (WP 0083).
24. Install fuse block (Figure 2, Sheet 2, Item 15), two screws (Figure 2, Sheet 2, Item 18), two nuts (Figure 2,
Sheet 2, Item 17), and four fuses (Figure 2, Sheet 2, Item 16).
25. Install fuse block (Figure 2, Sheet 1, Item 11), two screws (Figure 2, Sheet 1, Item 14), two nuts (Figure 2,
Sheet 1, Item 13), and three fuses (Figure 2, Sheet 1, Item 12).
0042-12