ARMY TM 9-6115-671-14
AIR FORCE TO 35C2-3-446-32
MARINE CORPS TM 09249A/09246A-14
5-17
(42) Remove nuts (11), washers (12), plates (16), angles (17), washers (14), nuts (15), and bolts (13)
from generator.
(43) Remove bolts (19), lockwashers (20), washers (21), and engine supports (22) from engine.
(44) Remove bolts (23), lockwashers (24), washers (25), and rear engine supports (26).
(45) Remove locknuts (27), washers (28), bolts (29) and engine mounts (30) from skid base.
b. Installation.
(1)
Install engine mounts (30, Figure 5-1), bolts (29), washers (28), and locknuts (27) on skid base.
(2)
Install rear engine supports (26), washers (25), lockwashers (24), and bolts (23) on engine.
(3)
Install engine supports (22), washers (21), lockwashers (20), and bolts (19) on engine. Torque
bolts to 120 ft-lb (162.6 Nm).
(4)
Position shock mounts (18) at generator mounting points on skid base.
(5)
Install angles (17), plates (16), nuts (15), washers (14), bolts (13), washers (12), and nuts (11)
on generator.
(6)
Install front engine lifting bracket (44), lockwashers (43), and bolts (42).
(7)
Install rear engine lifting bracket (47), lockwashers (46), and bolts (45).
CAUTION
Rated capacity of overhead hoist should be at least 2000 lbs (907 kg). Arrange lifting device to
that it supports both engine and generator to avoid undue stress on the engine and generator
coupling. Failure to comply can cause damage to equipment.
(8)
Attach lifting harness to engine and generator lifting points. Raise engine and generator
assembly from maintenance stand or fixture.
(9)
Position engine and generator assembly on skid base with mounting holes and brackets aligned.
(10) Cut cable ties from generator power leads (48).