ARMY TM 9-6115-670-14&P
5-50
5.18. RELAY BOARD.
This task covers: a. Inspect
b. Replace
INITIAL SETUP
Tools
General Mechanic's Tool Kit
(Item 1, Appendix B)
Materials/Parts
Relay Board
10 Amp Fuse
5 Amp Fuse (2)
Equipment Conditions
MASTER ON-OFF switch on APU control unit set
to OFF.
Air filter removed (para 4.45.).
INSPECT
a. Remove four screws (JTACS), or slotted hex-head bolts (SICPS and WIN-T), flat and lock
washers (1, Figure 5-12) and remove generator housing top cover (2).
b. Remove four screws (JTACS), or slotted hex-head bolts (SICPS and WIN-T), flat and lock
washers (5) and generator housing side cover (4).
c. Inspect fuses F1, F2, and F3 (7) on relay board (6).
d. Replace blown fuses (7).
REPLACE
a. Remove four screws (JTACS), or slotted hex-head bolts (SICPS and WIN-T), flat and lock
washers (1), and generator housing top cover (2).
b. Remove four screws (JTACS), or slotted hex-head bolts (SICPS and WIN-T), flat and lock
washers (5), and generator housing side cover (4).
c. Refer to foldout F0-1 (SICPS/WIN-T) or F0-7 (JTACS) and tag and remove electrical leads from
relay board (6).
d. Remove six nuts with captive washers (8) (JTACS) securing relay board (6) to vibration mounts
(3), or six screws, flat washers, lock washers, vibration mounts, and hex nuts (SICPS and WIN-
T) and remove relay board (6).
WARNING
Ensure that APU DC power supply is disconnected.
Failure to observe this warning could result in severe
injury or DEATH to personnel.
WARNING
Ensure that the APU is turned off and completely de-
energized before opening generator housing.
Failure to observe this warning could result in severe
injury or DEATH to personnel.