ARMY TM 9-6115445-24
AIR FORCE TO 35C2-3-444-12
MARINE CORPS TM 09244A/09245A-24/2
2-64 PARALLEL CONNECTOR.
2-64.1
a.
b.
c.
d.
e.
2-64.2
a.
b.
c.
d.
e.
f.
2-64.3
a.
b.
c.
d.
NOTE
Parallel connector is a component of control box harness assembly, but can be removed
and installed separately as follows.
Inspection.
Shut down generator set.
Inspect parallel connector for cracks, corrosion, stripped or damaged threads, evidence of shorting or other
damage.
Inspect cap for cracks, corrosion, and broken chain.
Inspect gasket for tears and deterioration.
Replace defective parts.
Removal.
Shut down generator set.
Open battery access door and disconnect negative battery cable.
Remove control box top panel, paragraph 215.1.
Tag and disconnect parallel connector (65, FIGURE 214) electrical leads by inserting removal tool into pins
of connector.
Remove screws (63), nuts (64), and cap (66).
Remove parallel connector (65) and gasket (67).
Installation.
Install parallel connector (65, FIGURE 214), gasket (67), and cap (66) with screws (63) and nuts (84).
Connect electrical leads using insert tool and remove tags.
Install control box top panel, paragraph 2-15.4.
Connect negative battery cable. Close battery access door.
2-65 LOAD MEASURING UNIT.
2-65.1
a.
b.
2-65.2
a.
b.
c.
d.
e.
f.
Inspection.
Shut down generator set.
Inspect load measuring unit for damaged case, cracked or broken terminal lugs, and loose or missing hard-
ware.
Removal.
Shut down generator set.
Open battery access door and disconnect negative battery cable.
Remove control box top panel, paragraph 215.1.
Release control panel by turning two fasteners and lower control panel slowly.
Tag and disconnect load measuring unit (69, FIGURE 2-14) electrical leads.
Remove screws (68) and load measuring unit (69).
2-95