TM 5-6115-365-15
C3
Figure 20-6. Electrical distribution system.
20-13. Tarpaulin, Roof Bows, and Leg Prop
(Fig. 20-5)
a.
Removal
(1)
Remove tarpaulin from unit.
(2)
Pull out chain-secured pins that secure
roof bows to trailer bed and remove bows.
(3)
Remove nuts, washers, and capscrews
that secure leg prop to rear of trailer and remove leg
prop.
b.
Cleaning and Inspection.
(1)
Clean tarpaulin and bows with water and
detergent. Clean leg prop with cleaning solvent. Dry
thoroughly.
(2)
Inspect tarpaulin for tears, holes, broken
or missing ropes and straps, and other defects.
Inspect bows and leg prop for cracks, bends, or other
defects.
c.
Installation. Installation is reverse of procedure
a above. Be sure tarpaulin is treated for waterproofing
and mildew resistance before reinstalling.
20-14.
Transfer
Switch
Indicating
Lamp
Replacement
Unscrew defective lamp from transfer switch box and
remove gasket. Install gasket on replacement lamp and
screw into base socket in transfer box.
Section V. DIRECT AND GENERAL SUPPORT AND DEPOT MAINTENANCE INSTRUCTIONS
20-15. Generator Set
(Fig. 20-7)
a.
Removal.
(1)
Disconnect fuel line at generator set.
(2)
Disconnect electrical leads and load
cables.
(3)
Disconnect oil drain adapter.
(4)
Remove the battery.
(5)
Disconnect exhaust pipe from engine.
(6)
Remove nuts, washers, and cap
20-7