TB 11-6115-741-24
ADDITIONAL MAINTENANCE REQUIREMENTS
1.15 Topcoat.
For generator
repaired at
Tier 2
facilities, the generator
set housing and trailer shall have a
final topcoat of CARC paint in accordance with MIL-DTL-53072, color/pattern as specified by CECOM.
1.16.1 All data plates, decals and electrical schematic diagrams shall be legible. Questionable items shall
be replaced.
1.16.2 For generator sets remanufactured at Tier 2 facilities, an additional data plate shall be affixed to the
generator set that contains the following data:
Hour meter reading (of remanufactured/new engine) after final test
Remanufactured/new engine serial number
Date of the remanufacture
Remanufacture (Tier 2) name
1.17 Modification Work Orders
(MWO). All
current design
upgrades will be
applied unless otherwise
directed. Any deviation(s) must be identified in writing.
1.18 Oil Seal and Gasket Leakage.
There shall be no leakage
permitted.
1.19 Mandatory Replacement Parts. See Appendix J, K, and I
for the
TIER 1
Mandatory Replacement
Parts Lists. TIER 2 Mandatory Replacement Parts Lists shall include the TIER 1 Lists plus all other parts
as specified herein.
1.20 Hardware. Hardware shall be replaced if
broken. Hardware may be
reconditioned/reused or
equal
or greater value hardware substituted if the material is not readily available through the supply channels.
Any locking device (such as lock washers, etc.) that is removed will not be reused.
1.21 Corrosion
and Painting. In
accordance with Appendix A for Rust and
Corrosion. New internal
items that are
replacement items will not be repainted. Access doors, covers, panels, and the control box will only be
disassembled as necessary to facilitate any repair. Damaged and corroded items will only be
disassembled to a level where repairs can be made. Replacement of items or next higher assembly may
be an option. Interior surfaces shall only be cleaned and shall not be repainted unless an item has been
repaired. The repaired surface(s) then shall be spot painted or hand touched-up. Stage 1 and 2 rust on
interior surfaces is acceptable and shall not require a repair or paint with the exception that no rust is
acceptable on any sealing surface. Exterior surfaces shall be painted with CARC paint in accordance with
MIL-DTL-53072, color/pattern as specified by CECOM.
1.22 Components of
End Item and Basic Issue Items (BII). These items
shall not be
provided by the
TIER 2 facility.
1.23 Parallel Cable
and Auxiliary Fuel
Line. If
provided with the generator
set, these items
shall be
repaired or replaced as required.
1-7/(1-8 blank)