ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
2 KW DEPROCESSING CHECKLIST
For use of this checklist, see the Deprocessing check sheet
Required items:
Fuel
DL-1, DL-2, or JP8
Lubricating oil
GR OEA, GR OE/HD-15, GR OE/HDO-10, GR OE/HDO-
30 or GR OE/HDO-40
Ground rod
Ground cables
6 AWG min.
Tool kit
Container
suitable for excess fuel
Cloth
for fuel spilling
Load bank
Hearing protection
24 VDC battery source (for cold weather starting)
Checklist
Packaging material
Identification plate
Frame
Control panel
Before Preventive Maintenance Checks and Services
During Preventive Maintenance Checks and Services
After Preventive Maintenance Checks and Services