ARMY TM 9-6115-673-13&P
AIR FORCE TO 35C2-3-512-1
Operate the generator set 15 minutes minimum to ensure that no leaks are detected,
and a load can be drawn.
Item 1
Instrument Panel
Item 4
Ground Terminal Stud
Item 7
Fuel system
Item 8
Item 9
Cylinder head cooling fins and recoil starter cover.
2.3
After Preventive Maintenance Checks and Services (table 2-2).
Item 1
Instrument Panel
Item 2
Identification and Instruction Plates
Item 6
Filter Assembly, Fuel
Item 7
Fuel System
Item 8
Item 9
Cylinder head cooling fins and recoil starter cover.
3. Quality Deficiency Report (QDR)
Develop a QDR on any deficiencies, which prevent operational capabilities from being
achieved.
M-4