Table 4-4. DISE AND PDISE FEEDER/DISTRIBUTION CENTER CONTINUITY CHECKS (cont)
NOTE
Refer to paragraph 4-14 for DISE and paragraph 4-17 for
PDISE and expose phase bus bars as necessary.
All checks
are made with circuit breakers closed.
X indicates continuity.
O indicates no continuity.
c.
M40 and M40 A/P Distribution Center. (cont)
Phase A (L1)
Phase B (L2)
Phase C (L3)
Neutral (LO) Ground (G)
J13-A
x
0
0
0
0
J13-B
0
0
0
x
0
J13-C
0
0
0
0
x
J14-A
x
0
0
0
0
J14-B
0
0
0
x
0
J14-C
0
0
0
0
x
d.
M60 Distribution Center (see Fig.
4-4) and M60 A/P Distribution
Center (see Fig. 4-8).
J1-A
J1-N
J1-G1
J1-G2
J2-A
J2-N
J2-G1
J2-G2
J3-A
J3-B
J3-C
J4-A
J4-B
J4-C
J5-A
J5-B
J5-C
4-18
Phase A (L1)
x
0
0
0
x
0
0
0
x
0
0
x
0
0
x
0
0
Neutral (L0)
0
x
0
0
0
x
0
0
0
x
0
0
x
0
0
x
0
Ground (G)
0
0
x
x
0
0
x
x
0
0
x
0
0
x
0
0
x