TM 9-6115-669-13&P
(PMCS). -continued
Table 2-9 Electric Power Plant III, Operator Preventive Maintenance Ckecks and Services
Item
Location
Not Fully Mission
Number
Interval
Item to Check/&vice
Procedure
Capable if:
17
After
Control Cable Reel
Check for operation of reel,
Reel will not allow cable
ratchet and release mechanism.
to be unreeled. Release
mechanism will not op-
erate. Loose or missing
hardware.
18
After
Fire Extinguisher
Check for presence of two extin-
Fire extinguishers are
guishers and pins and seals.
missing or pins removed
or seals broken.
19
After
Grounding Rod and
Ground Cable (Rod to
PDU)
Check ground connection at-
Ground rod is missing,
tachment of grounding cables.
not attached to ground
Loose or missing hardware.
cable, ground cable is
not attached to PDU.
20
After
Ground Cables (Genera-
Check ground connection be-
Ground cable is loose,
tor Set to Pallet Frame
tween Generator Set and Pallet
missing or broken.
and Pallet Frame to
frame and Pallet frame to
Loose or missing hard-
Truck)
truck.
ware.
2 - 3 1